Skip to content

💰 Payment Terms

  • 50% Advance – Payable at the time of order confirmation.
  • 30% Upon Delivery – Due after the materials are delivered to the site.
  • 20% Final Payment – Payable upon successful system installation and commissioning.

📅 Validity & Revisions

  • All quotations are valid for 3 calendar days from the date of issuance.
  • Any request for specification changes or extension of quote validity may require a revised quotation and adjusted delivery timeline.

📄 Quotation & Site Survey

  • All quotations are considered preliminary until a physical site survey is conducted.
  • Prices shared before a survey are indicative only and may be adjusted based on real conditions.

⚙️ System Design & Installation

  • Panel layout is based on approved technical drawings. Final positioning may be adjusted due to shadow analysis or on-site recommendations by the engineering team.
  • Inverter placement is optimized for performance and efficiency, typically installed closest to the distribution board (DB).
  • Wiring is routed to minimize losses and ensure system safety and aesthetics.

🧾 Taxes & Government Levies

  • All prices are exclusive of applicable government taxes or duties.
  • Any change in tax laws or government levies after quotation will be borne by the customer.

💱 Currency Fluctuations

  • Prices are tied to the USD–PKR exchange rate. Any fluctuation resulting in a cost increase will be the customer’s responsibility.

🛡️ Warranty & Liability

  • Green Vision Engineering’s warranty does not cover damage resulting from:
  • Negligence, misuse, or unauthorized modification
  • Electrical surges, lightning, fire, or natural disasters
  • Vandalism or tampering post-installation
  • Responsibility for equipment transfers to the client upon delivery. The supplier is not liable for damages after handover or due to unforeseeable environmental events.

🌤️ Performance Disclaimer

  • Solar system output is directly influenced by weather and sunlight conditions. Performance may reduce during:
  • Cloudy or overcast weather
  • Seasonal variations and regional sunlight patterns

🗓️ Project Timeline

  • Installation will begin within 7 days of order confirmation, subject to material availability and weather conditions.

🔄 Change Management

  • Any structural or design changes requested after confirmation will result in a revised quotation.
  • Additional costs arising from changes are the client’s responsibility.

🤝 Service Commitment

  • Green Vision Engineering is committed to delivering:
  • Top-tier solar installation and commissioning services
  • Ongoing support to ensure system functionality and client satisfaction